About this project

I’d been keeping an eye on these commercial sheds for a while as we’d often drive past on the way to school drop off.

My idea was to convert an Industrial Warehouse (concrete tilt slab construction) into office space!

These are the stages of the build so far, if you have any questions about this project email [email protected]

As part of our 2024 expansion, the Capital Properties Team is going back to the office!

Stage 1.

Installation of ‘corflute’ to protect the concrete polish.

Stage1v1

Stage 2.

Delivery of the flooring supports & Frames.

Stage2v1

Stage 3.

Mezzanine floor construction.

Stage3v1

Stage3.1v1

Stage 4.

Frame construction.

Stage4.1v1

Stage4v1

Stage 5.

Air Conditioning install.

Ac Install (1)

Ac Install (2)

Stage 6.

Air Conditioning frame & Ground Floor ceiling frame & ceiling battens.

 

Insulation (1)

Hallway Frame

Stage 7.

Insulation Install.

Insulation (4)

Insulation (7)

Stage 8.

Plaster Board install.

Plasterboard (1)

 

More to come soon, stay tuned…